Our Projects
 
KEA is proud of the numerous and prestigious projects carried out in many parts of our country , the Philippines. And several assignments in some parts of the world through our international associates.
 
2nd Mandaue-Mactan Bridge 3D Dynamic Analysis
Conceptual Design of Expressway Interchange along Laguna De Bay
Detailed Design of South Luzon Expressway: Toll Road No. 1 (Alabang Viaduct Rehabilitation & Widening) & Alabang-Zapote Road
Detailed Design of South Luzon Expressway: Toll Road No. 3 (Calamba to Sto. Tomas Road Section)
DPWH Bridge Construction/Replacement Project Under Spanish Government Financing
Eastgate N2 On-Ramp
EDSA Capacity
EDSA MRT-3
EDSA-Estrella Left Turn Flyover
EDSA-North Ave.-West Ave. Interchange and EDSA-Roosevelt Ave. Interchange Project
EDSA-Pasay-Ayala Ave. Interchange
EDSA-Quezon Ave. Interchange Project
Fort Bonifacio - Kalayaan/EDSA Buendia Flyover
Fort Bonifacio Traffic Signalization
Gapan-San Fernando-Olongapo Road Widening
Makati Loop Project
Manila Cavite Toll Expressway Project R-1 Extension, Segment 4
Ninoy Aquino International Airport Expressway and Its Related Roads Project
Pre-Feasibility Study and Detailed Engineering Design of Metro Manila Skyway, Stage 3 Project
Preparation of Detailed Engineering Designs/Plans Working Drawings, Including Specifications for the Construction of Flyover Crossing Slex Connecting President Carlos P. Garcia Ave (C-5 Road) Project
Preparation of Traffic and Technical Study for the Southeast Metro Manila Expressway (with Skyway Linkage)
SAPROF Study and Detailed Engineering Design of North Java Corridor Flyover Project
SCTEx, Mabalacat and Tipo Toll Plazas, SA No. 8
Subic-Clark-Tarlac Expressway Project (SCTEP
Technical Study for Skyway Stage 4 (Southeast Metro Manila Expressway) Phase 1 North Extension
Eastgate N2 On-Ramp
 
Description: Design of N2 On-Ramp to cross the Circumferential Road C5 connecting Mabini Street of Global City with the northbound traffic of Circumferential Road C5
Location: Taguig City, Philippines
Client: Fort Bonifacio Development Corporation (FBDC)
Type of Services: Detailed Design
Project Cost: 5.1Million Php
Date of Completion: August 2009
 
The project involves the Basic and Detailed Engineering Design of a 450m,On-Ramp,which will provide an ingress from 32 Ave. of Fort Bonifacio to C5 Northbound. The N2 On-Ramp will start at the proposed abutment near Market!Market! and will cross C5 before descending along the separator island between C5 Northbound and the existing service road.

The on-ramp section will carry a two-lane 8.50 meter width carriageway. This will provide an efficient egress from the Global City and is expected to improve the traffic flow along Mabini Street.

2nd Flr. Francisco Court Bldg. #12 First St., New Manila Quezon City, Ph
Tel: (+632) 727-7257, 416-8470 to 71 Fax: (+632) 727-7258
Copyright 2018. All rights Reserved.
Developed By: 348 Web Solutions
Visitor Count: 50142