Our Projects
 
KEA is proud of the numerous and prestigious projects carried out in many parts of our country , the Philippines. And several assignments in some parts of the world through our international associates.
 
2nd Mandaue-Mactan Bridge 3D Dynamic Analysis
Conceptual Design of Expressway Interchange along Laguna De Bay
Detailed Design of South Luzon Expressway: Toll Road No. 1 (Alabang Viaduct Rehabilitation & Widening) & Alabang-Zapote Road
Detailed Design of South Luzon Expressway: Toll Road No. 3 (Calamba to Sto. Tomas Road Section)
DPWH Bridge Construction/Replacement Project Under Spanish Government Financing
Eastgate N2 On-Ramp
EDSA Capacity
EDSA MRT-3
EDSA-Estrella Left Turn Flyover
EDSA-North Ave.-West Ave. Interchange and EDSA-Roosevelt Ave. Interchange Project
EDSA-Pasay-Ayala Ave. Interchange
EDSA-Quezon Ave. Interchange Project
Fort Bonifacio - Kalayaan/EDSA Buendia Flyover
Fort Bonifacio Traffic Signalization
Gapan-San Fernando-Olongapo Road Widening
Makati Loop Project
Manila Cavite Toll Expressway Project R-1 Extension, Segment 4
Ninoy Aquino International Airport Expressway and Its Related Roads Project
Pre-Feasibility Study and Detailed Engineering Design of Metro Manila Skyway, Stage 3 Project
Preparation of Detailed Engineering Designs/Plans Working Drawings, Including Specifications for the Construction of Flyover Crossing Slex Connecting President Carlos P. Garcia Ave (C-5 Road) Project
Preparation of Traffic and Technical Study for the Southeast Metro Manila Expressway (with Skyway Linkage)
SAPROF Study and Detailed Engineering Design of North Java Corridor Flyover Project
SCTEx, Mabalacat and Tipo Toll Plazas, SA No. 8
Subic-Clark-Tarlac Expressway Project (SCTEP
Technical Study for Skyway Stage 4 (Southeast Metro Manila Expressway) Phase 1 North Extension
EDSA-Quezon Ave. Interchange Project
 
Description: Construction of grade separation of EDSA and Quezon Blvd.
Location: Quezon City, Philippines
Client: Department of Public Works and Highways (DPWH)
Type of Services: Detailed Design and Construction Management
Project Cost: 758 Million Php
Date of Completion: December 2002
 
Located in the northern part of Metro Manila, where Quezon Ave. crosses EDSA.The intersection of EDSA-Quezon Ave. is now among the busiest in Metro Manila. When the MRT-3 proposed a grade separated crossing across Quezon Ave.,KEI assisted DPWH in finding a way
to improve the highway capacity before the railway transit station would begin and that would put heavy strain on the Intersectionís capacity.

The traffic demand already exceeded the capacity and decided that improvements to EDSA and Quezon Ave. were required before construction on the MRT-3. The original design calculations,drawings, specifications and contract documents were prepared by KEI.

After KEIís completion of the detailed design for this interchange, MRTC decided to relocate the Quezon Ave. Station from the north side to the south side of Quezon Ave. This necessitates realignment and redesign of the various components of this project. KE ASIA,in coordination with KEI, and MRTC, and DPWH prepared the redesign of this interchange taking into account the new location of the MRT Station. Existing plans have been revised to suit the new requirements
for alignment.

The construction includes two grade separated 3-lane Viaducts crossing Quezon Avenue on EDSA.

The depressed section requires enhancements of downstream drainage creeks and construction of emergency pumping stations for storm water overflow.

The redesign of the flyover includes: (a)study of realignment to suit the requirement of MRT Station relocation, (b)design revision of three(3) span continuous pre-stressed concrete viaduct,(c)PC hollow slab depressed structures(d)drainage system and(e)revision of Construction Contract Documents.

2nd Flr. Francisco Court Bldg. #12 First St., New Manila Quezon City, Ph
Tel: (+632) 727-7257, 416-8470 to 71 Fax: (+632) 727-7258
Copyright 2017. All rights Reserved.
Developed By: 348 Web Solutions
Visitor Count: 45340